500kva generator hire

A 500 kVA diesel generator delivers 400 kW of usable power — enough to run a large construction site, an industrial facility, a data centre on backup, or a major event. Rental Power supplies serviced, load-tested 500 kVA units from Cummins and Perkins across Dubai, Abu Dhabi and Sharjah, delivered and connected on-site. The exact specs are below — fuel consumption, output, footprint — so you can confirm this is the right size before you book.

Call now: +971 56 921 3754

What a 500 kVA Generator Powers

A 500 kVA set gives you around 400 kW of continuous usable load. Realistic uses:

  • Large construction site — multiple tower cranes, concrete plant, welding, site-wide lighting and offices on one supply
  • Industrial facility / factory — process machinery, compressors and production lines
  • Data centre or hospital backup — critical load with the headroom to carry HVAC and IT together
  • Major event or concert — full staging, lighting rig, sound, catering and cooling
  • Prime power on an isolated site — oilfield, remote camp or a location with no reliable grid

If your total load is above roughly 350 kW, step up to a 1000 kVA generator or run multiple units in synchronisation. If you’re well under 300 kW, a 100 kVA generator or mid-size set will cut your fuel and generator rental cost — our team will size it for you.

500 kVA Generator Specifications

Specification Value
Prime output 500 kVA / 400 kW
Standby output 550 kVA / 440 kW
Voltage 400V 3-phase / 230V single-phase
Full-load current 722 amps at 400V, 3-phase
Frequency 50 Hz
Speed 1500 rpm
Power factor 0.8
Engine options Cummins, Perkins
Enclosure Silent canopy or open-frame
Base fuel tank ~850–900 litres (approx. 8 hrs at full load)

500 kVA Generator Fuel Consumption

Fuel is the biggest cost on a set this size, so plan around it. Approximate diesel use for a 500 kVA generator by load:

Load Power drawn Fuel use
25% 100 kW ~30 litres/hour
50% 200 kW ~52 litres/hour
75% 300 kW ~76 litres/hour
100% 400 kW ~100 litres/hour

Most sites run near 50% load, so expect roughly 52 litres/hour — around 1,250 litres on a 24-hour day. The standard base tank holds ~850–900 litres for about 8 hours at full load; larger external bulk tanks are available for extended runtime. We quote fuel as a separate line item, so there are no billing surprises.

Dimensions, Weight & Site Placement

A 500 kVA set is heavy plant — plan access and ground before delivery day:

Specification Silent (canopied) Open-frame
Length ~5.5 m ~3.4 m
Width ~1.2 m ~1.5 m
Height ~2.5 m ~2.2 m
Weight ~4,900 kg ~3,900 kg

Placement requirements:

  • Firm, compacted ground or hardstanding able to take ~5 tonnes
  • Delivered by crane/hiab or low-loader — needs clear, wide access for offloading
  • Room around the unit for airflow, exhaust dispersal and refuelling access
  • Silent canopy for noise-sensitive sites like events, hospitals and occupied buildings

What’s Included With Every 500 kVA Rental

Every unit arrives ready to run:

  • Base fuel tank
  • Distribution board
  • Manual or automatic changeover switch
  • Synchronisation panel (for multi-unit setups)
  • Cables and cable ramps
  • Delivery, installation and on-site load testing
  • 24/7 support for the rental period

Cable and breaker sizing is handled by our technicians on-site — a 500 kVA set draws 722 A, so it pairs with an 800A main breaker and appropriately rated cabling, sized to your load and run.

Contact us for a quote: +971 56 921 3754

Silent vs. Open-Frame 500 kVA

  • Silent / acoustic — our fully enclosed silent generator is built for noise-sensitive sites like events, hospitals, hotels and occupied buildings
  • Open-frame — lower cost, faster to deploy, best for open industrial sites, oilfields and yards

Both available for immediate hire across the UAE. For continuous high-load industrial duty, see our heavy duty generator range.

FAQs

How many amps is a 500 kVA generator?

722 amps at 400V, 3-phase, 50 Hz. Tell us your connection and we’ll confirm for your setup.

How much fuel does a 500 kVA generator use per hour?

Around 52 litres/hour at 50% load and up to ~100 litres/hour at full load, depending on your load profile.

What can a 500 kVA generator run?

About 400 kW of load — a large construction site, an industrial facility, a data centre or hospital on backup, or a major event. Above ~350 kW, step up to 1000 kVA or synchronise multiple units.

How big is a 500 kVA generator?

A silent 500 kVA unit is roughly 5.5 m long, 1.2 m wide and 2.5 m high, weighing about 4,900 kg. It needs compacted ground and crane or low-loader access for placement.

Can I run two 500 kVA generators together?

Yes — units can be synchronised to share load or provide N+1 redundancy for critical sites. We supply the sync panels and set it up on-site.

What’s the minimum rental period for a 500 kVA generator?

We offer short-term and long-term rentals — get in touch with your project dates and we’ll confirm terms.

Rent a 500 kVA Generator Today

Need 400 kW of reliable power on-site fast? We deliver 500 kVA generators across Dubai, Abu Dhabi and Sharjah — part of our full rental generator in UAE fleet.

+971 56 921 3754